Detailed engineering for a retort (shale) gas pipeline with a capacity of up to 8,000 Nm³/h, feeding secondary fuel gas to the power boilers of Unit 8 at Eesti Thermal Power Plant. Executed for Alstom Estonia, the scope encompassed gas conditioning, pressure regulation, metering, and safety interlock design.

Key Specifications

  • Client / General Contractor: ALSTOM ESTONIA
  • Facility: Eesti Power Plant, Unit 8
  • Capacity: Up to 8,000 Nm³/h
  • Medium: Retort (oil shale) gas
  • Scope: Detailed design of gas supply piping, pressure control valves, and metering skids