EESTI POWER PLANT — Retort Gas Pipeline for Unit 8 Boilers (8,000 Nm³/h)
Retort gas pipeline design for Unit 8 boilers at Eesti TPP (up to 8,000 Nm³/h).
Project Overview
Detailed engineering for a retort (shale) gas pipeline with a capacity of up to 8,000 Nm³/h, feeding secondary fuel gas to the power boilers of Unit 8 at Eesti Thermal Power Plant. Executed for Alstom Estonia, the scope encompassed gas conditioning, pressure regulation, metering, and safety interlock design.
Key Specifications
- Client / General Contractor: ALSTOM ESTONIA
- Facility: Eesti Power Plant, Unit 8
- Capacity: Up to 8,000 Nm³/h
- Medium: Retort (oil shale) gas
- Scope: Detailed design of gas supply piping, pressure control valves, and metering skids

