Project Overview
Turnkey EPC contract for the reconstruction of the combustion air distribution and preheating system on the BKZ-75-39F steam boiler. The design maintains tubular air preheater metal temperatures above the sulfuric acid dew point, successfully eliminating low-temperature acid corrosion and extending equipment lifetime.
Key Specifications
- Client / Facility: VKG Energia OÜ
- Boiler Unit: Steam boiler BKZ-75-39F
- Contract Type: Turnkey EPC (Engineering, Procurement, Construction)
- Objective: Cold-end sulfuric acid corrosion prevention
- Scope: Reconstruction of air preheating steam coils, air ducts, and automated air temperature control loops