SILBET AS — 6 MW Gas-Fired Steam Boiler Plant (EPC)

EPC contract for a 6 MW gas-fired steam boiler plant (VIESSMANN boiler, WEISHAUPT burner).

Project Overview

Turnkey EPC contract for the design and construction of a 6 MW gas-fired steam boiler plant for SILBET AS building materials factory. The installation features a high-efficiency VIESSMANN steam boiler equipped with a WEISHAUPT gas burner.

Key Specifications

  • Client: SILBET AS
  • Capacity: 6 MW
  • Equipment: VIESSMANN boiler, WEISHAUPT burner
  • Fuel: Natural gas
6 MW Gas-Fired Steam Boiler Plant