SILBET AS — Design and Installation of Process Steam Piping (12 bar) for 3 Building Block Autoclaves (PED 97/23 Module G)

Design and installation of process steam piping (12 bar) for 3 building block autoclaves (PED 97/23 Module G).

Project Overview

Detailed engineering, supply, and installation of 12 bar saturated steam process piping interconnections for three building block curing autoclaves. The project was executed and certified in full compliance with the Pressure Equipment Directive (PED 97/23/EC, Module G — unit verification).

Key Specifications

  • Client: SILBET AS
  • Operating Parameters: Saturated steam at 12 bar pressure
  • Equipment: 3 building block autoclaves
  • Certification: PED 97/23/EC (Module G)
  • Scope: Design, erection, and compliance verification of pressure piping
Silbet AS Steam Piping Installation
We use cookies
We use essential cookies to make our website work properly. Optional cookies and external services, such as Google Maps, may be used with your permission. You can accept or reject optional cookies, or manage your preferences in Cookie Settings.