Enefit Power AS — TP-101 boiler reconstruction with four ENTEH Low-NOx pyrolysis gas burners (45 MW each)
TP-101 boiler reconstruction with four ENTEH Low-NOx pyrolysis gas burners (45 MW each).
Project Overview
Major reconstruction of the TP-101 power boiler featuring the installation of four ENTEH Low-NOx pyrolysis gas burners rated at 45 MW each (180 MW total capacity). The engineering solution delivers optimal combustion efficiency for shale pyrolysis off-gas while keeping nitrogen oxide emissions well within environmental limits.
Key Specifications
- Client / Facility: Enefit Power AS
- Boiler Unit: Power boiler TP-101
- Burner Capacity: 4 burners × 45 MW (180 MW total)
- Fuel Type: Shale pyrolysis gas (retort gas)
- Technology: ENTEH Low-NOx staged combustion
- Scope: Engineering, fabrication, supply, installation, and complete commissioning