Eesti Elektrijaam — Flow Leveling Screen Installation on Turbine K-200-130

Installation of flow leveling screen in K-200-130 turbine path for low-load efficiency improvement.

Project Overview

Design and installation of an aerodynamic flow-leveling screen inside the flow path of a K-200-130 steam turbine at Eesti Power Plant. The upgrade stabilized steam dynamics and enhanced turbine efficiency during partial-load operating conditions.

Key Specifications

  • Client: Eesti Elektrijaam
  • Equipment: Steam turbine K-200-130
  • Objective: Flow path efficiency enhancement at low loads
Flow Leveling Screen Installation on Turbine K-200-130