Project Overview

Furnace modernization project for steam boiler #4, including the supply, integration, and commissioning of two high-efficiency 8 MW (16 MW total) generator gas burners. The solution provides complete combustion of low-BTU retort gases, precise automated fuel-air ratio control, and reliable boiler operation across the entire firing range.

Key Specifications

  • Client / Facility: KIVIÕLI KEEMIATÖÖSTUSE OSAÜHING
  • Boiler Unit: Steam boiler #4
  • Quantity & Capacity: 2 burners × 8 MW (16 MW total)
  • Fuel Type: Generator gas (low-calorific retort gas)
  • Scope: Engineering, manufacturing, installation, burner management, and control system integration