Enefit Green AS (Iru) — Boiler upgrade with three ENTEH Low-NOx dual-fuel burners (23 MW each)

Boiler upgrade with three ENTEH Low-NOx dual-fuel burners (23 MW each).

Project Overview

Reconstruction and modernization of the boiler combustion system at Iru Power Plant for ENEFIT GREEN AS. The project involved the engineering, supply, installation, and commissioning of three ENTEH Low-NOx dual-fuel burners to ensure compliance with stringent European environmental standards for nitrogen oxide emissions.

Key Specifications

  • Client / Facility: Enefit Green AS (Iru Power Plant)
  • Thermal Capacity: 3 × 23 MW
  • Burner Type: ENTEH Low-NOx dual-fuel burners
  • Fuel Types: Natural Gas / Light Fuel Oil (LFO)
  • Scope: Engineering, supply of burner equipment, installation, tuning, and commissioning
Enefit Green AS Low-NOx Burner Upgrade