Eesti Energomontaaž AS / FORTUM — Detail Engineering for Air Duct and Heating Surface Modifications on TP-101 Boiler for Two-Stage Combustion (NOx Reduction)

Detail engineering for air duct and heating surface modifications on TP-101 boiler for two-stage combustion (NOx reduction).

Project Overview

Detailed engineering design for the modernization of the TP-101 utility boiler to implement staged combustion (Overfire Air / OFA). The scope included secondary and tertiary air duct re-routing, heating surface arrangement optimization, and insertion of overfire air ports to effectively suppress primary NOx formation in the furnace zone.

Key Specifications

  • Client / General Contractor: Eesti Energomontaaž AS / FORTUM
  • Boiler Unit: Utility boiler TP-101
  • Technology: Two-stage staged combustion (Overfire Air / OFA)
  • Objective: Primary reduction of nitrogen oxide (NOx) emissions
  • Scope: Detailed design for air duct and furnace heating surface modifications
TP-101 Boiler OFA NOx Reduction Modifications